Knobs

Zinc Alloy Knob X-029

Cylindrical push button with a silver PUSH-marked top and a black raised-particle anti-slip body — a firm, reliable control for outdoor gas BBQ grills.

  • MOQ1,000 pcs
  • Lead time30 days
  • ServiceSourcing · QC · Consolidation · Shipment

Specifications

MaterialZinc Alloy + Rubber
Surface FinishBrush nickel or bright chrome
Diameter52mm
Height27mm
Insert open6mm & 8mm available

Description

This BBQ grill push button (model X-29) features a die-cast metal cylinder with a silver top printed with a clear PUSH marking and a black rubber raised-particle anti-slip layer around the side. The textured body keeps your finger and hand steady even when wet or greasy, while the PUSH marking makes operation obvious and reliable — a dependable control component for outdoor gas BBQ grills.

Built for long service life:

  • Zinc alloy + rubber — durable, heat-resistant and corrosion-resistant
  • Raised-particle anti-slip body — firm, reliable press even when wet or greasy
  • PUSH marked top — clear, intuitive operation
  • Weather-ready — resistant to UV, rain, humidity and daily outdoor wear
  • Easy OEM — silk-screen, pad, roller or laser-engraved brand logo available

Suitable for gas BBQ grills, pellet grills and outdoor cooking equipment. Fitment based on shaft size; confirm valve shaft (6mm / 8mm) before ordering.

Hardware Parts FAQ

What is the MOQ for knobs and handles?

Normally MOQ is 1000pcs per our own pattern, for new design, MOQ is 3000pcs.

What finishes are available?

Brushed nickel or bright chrome as standard; logo silk printing / pad printing / roller printing and laser printing are available.

Is there a mold charge?

For standard patterns, mold charge is free. For the new-design collection, mold charge is prepaid and the design stays exclusive to you.

Can I get custom designs?

Yes. Our partner factory Leaderway has 1,000+ patterns and offers full customization — share your drawing or sample and we develop it.

What is the lead time?

30 days for standard patterns; 45 days development period for new designs.

Same order, less work

Add our supply-chain service to this order

Factory verification, pre-shipment QC with photo and video evidence, consolidation and shipment coordination — added to this order, handled by the same team.

See how it works →